    Asphalt Batching Plant

    LB1500 ASPHALT MIXING PLANT

    LB1500 ASPHALT MIXING PLANT
    Display pictures1
    1. Brief Introduction LB1500 ASPHALT MIXING PLANT is designed and developed by our company, using Japan Niigata NP1500 ASPHALT MIXING PLANT technique. It's main performance can get to congener product, the idea of design consider the situation of a country on china sufficiently, with higher cost performance. It is fit to produce asphalt material of surface and base. The equipment use craftwork of forcible mix, intermittent discharge. Various of sandstone material and powder lot, bitumen can be weighed by electronic scale, controlled by industrial computer, easy operation, reliable performance.

    Detailed

    2. Industrial Craftwork Process

    3. Construction Characteristic

    1) Hopper adjusts quantity of material by leather belt in control room.

    2) Optimization designed Turn—down rig of dryer which has a logical placement is not only to improve efficiency but also to avoid overheat of aggregate.

    3) Hot material elevator use loop chain transmission, life is long, convenient maintenance, fine reliability.

    4) Screening plant which uses middle four layers circular screen of single axle is high in efficiency, not easily blocked. Vibrancy bearing which has a cooler fan solves middle vibrancy bearing overheat problem. Screening plant reduces influence of noise on complete appliance by second shock absorption. Consequently decreasing influence on measuring system. The body of screen is airproofed in the cover to avoid pollution of dust, the cover is locked by spring device, easily disassembled.

    5) Door of Storage bin is single one which is big gap, avoiding block and leakage of material。

    6) Door of measuring bin is in compaction and reliable, also avoiding block and leakage of material, shaft sleeve of bin is made of graphite, dry lubrication, no needing lubricant at work.

    7) Bitumen is nebulized and injected into the mixer coercively, mixed equality, time is reduced accordingly.

    8) Shaft tip of mixer uses chevron seal, avoiding leakage of material.

    9) Lining board in the mixer is high intension wear resistant material, after abrasion of blade, it’s direction can be changed, then using it newly.

    10) Discharge door of mixer is in the form of push and pull, discharge hole is big, time of discharge is short. Dependability is good.

    11) Dust collection system is a two grades system, the first is cyclone collection, after collection the filler goes into the hot material elevator and recycled. The second grade is wet collection, which is made up of two water pumps drenching the material. Efficiency of dust collection is improved very strongly. Bag collection is used in the second collection.

    12) Complete appliance is controlled by industrial computer, easy to study and understand, precision is high, Dependability is good. Printer can print working form. Electrical components use oversea and domestic famous brand products. Dependability of hardware is guaranteed.

    4. Working process

      Asphalt mix material is made up of bitumen, aggregate, powder. The main work of Asphalt mixing plant is to mix the hot aggregate with bitumen, powder after they are measured by electronic scale, producing asphalt mix material which has certain graduation , certain temperature.

    Working process as follows:

    1) Loaders load various sandstone material into the cold aggregate hoppers, material is conveyed to the dry device after quantity of various material in each hopper is roughly adjusted. Material is conveyed to vibrating screen upstairs by elevator. By screened, various hot aggregates are screened into hot hopper apart according to graduation, by controlling small gate under hot hopper, material is put into measuring hopper, then the quantity can be confirmed. Measuring which is a control system is made up of electronic sensor, electronic scale, small gate, pneumatic cylinder, solenoid valve, controlling quantity of each material in hoppers by opening and closing gate. After measured, material is put into mix cylinder.

    2) Hot bitumen is conveyed into mixing plant and injected into mix cylinder after measured by bitumen measuring jar.

    3) Filler is elevated to filler storehouse of mixing plant and put into mix cylinder after measured.

    Three materials are mixed and changed into final product.

    Model and productive capacity

    Model                                      LB1500

    Batch of mix cylinder                          1500Kg

           Average moisture content 3%, mix period 45s, output 120t/h.

           Asphalt with middle or bigger aggregate.

    Average moisture content 5%, mix period 60s, output 90t/h.

    Asphalt with smaller aggregate.

    Discharge Temperature                       140ºC—160ºC

    Correlative condition on Productive capacity

    1)Average moisture content only means moisture content of surface of material, moisture content of interior of material will reduce the productive capacity of dry cylinder.

    2)Environmental temperature is 20ºC.

    3)Density of material is 1600Kg/m³.

    4)Output includes weight of bitumen and stone powder.

    5)Aggregate proportion should be exact, in accordance with criterion of graduation.

    6)Density of Stone powder is 1120Kg/m³.

    Main equipment technical parameter, quantity

    1. Cold aggregate supply system

    Capacity of hopper: 8 m³                                4pieces

    Width of each hopper: 3000mm

    Height of each hopper: 3620mm

    Adjustable-speed motor: 1.5Kw                           4pieces

    Electromotor of Motorized head pulley: 3Kw               1 piece

    Belt width:650mm

    2. Belt feed system

    Electromotor of Motorized head pulley: 4Kw                 1 piece

    Belt width:500mm

    3. drying and fuel supply system

    1) Dryer 

    Type: acclivitous cylinder and friction wheel drive

    Capacity: 130t/h

    Spec: Ф2004mmx8430mm

    Reducer : 11Kw                                 4pieces

    2) Burner:diesel

             model:high-pressure nebulized

             capacity:720kg/h

    Fuel consumption:6.5-7 liters/ton asphalt(normal working situation and eligible aggregate)

          3)Diesel pump

             Model: gear pump

             capacity:1500L/h

             pressure:0-25MPa

             Fuel pump motor:                         1.1kW         1unit

             Diesel tank:                       20m3           1unit

         4)blower fan

            capacity:160m3/min

            motor:                                30kW           1unit

                      4. Filler elevator

    Electromotor: 3Kw                                1piece

    5. Hot elevator

    Electromotor: 15Kw                                1piece

    6. Screen system

    Middle vibrator which has four specs and four floors, bearing cool with fan, two grade damping, airproof between screen and hot bin.

    Spec of screen mesh 3x4 7x7 16x16 24x24mm

    We can also supply special mesh size according to customer demand.

    Electromotor: 7.5Kw                                1piece

    Capacity:120t/h

    7.Mixer 

    Type: horizontal and double axle, pull and push material gate

    Electromotor of Reductor: 45Kw                     1piece

    8.Framework

    9. Aggregate measuring device

    Sensor 1000kgs                                    4pieces

                     10.Filler measuring device                               

       Sensor   200kgs                                    3pieces

       Filler feed electromotor: 0.75Kw                   1piece

    11.Bitumen measuring device

       Sensor  200kgs                                    3pieces

    12.Bitumen spraying system

    After measured, bitumen is injected into mixer in form of nebulization.

    Electromotor of Bitumen pump: 15Kw                 1piece                      

    13. Pneumatic system

    Cylinder                                           10pieces

    Solenoid valve                                     10pieces

    Triplex part                                       2pieces

    Electromotor of Air compressor    7.5Kw            1piece       

    14. Dust collector (two grade, cyclone and wet filter)

    The first grade: double cyclone filter, reclaimed material goes into elevator directly

    The second grade: wet filter

         dust emission:≤300mg/Nm3

             Draught fan:                          55kW            1unit

             Water pump:                         7.5kW           1unit

             Water pump:                         15kW            1unit

    15.Electric control system

    Function: 1) Process of burdening with automatic control

    2) Various material mixed together can be modified at any moment

    3) Temperature and weight can be displayed

    4)Enactment or modify run parameter conveniently

    5)Error of burdening is corrected automatically

    6)Numerical value of Formulation input is corrected intelligently

    7)Current of each main Electromotor can be displayed

    8)Manual and automatic switch

    9)Process of production can be printed

    10)Data memory

    16.Bitumen supply system

    1) capacity: 20m³x2

    2) Bitumen injection pump

    Capacity: 443L/min

    Electromotor: 7.5Kw

    3) Bitumen convey pump

    Electromotor: 5.5Kw

    4) Bitumen discharge pool

    Capacity: 3.7m³

    17.Hot oil system

    1) Heating furnace

    Type: horizontal

    Capacity: 600000kcal/h

    2)Burner:  Original Italian Riello burner

    Type: automatic and temperature control oil-fired

    Capacity: 9~30kg/h

    Electromotor: 0.76Kw/h

    3)Hot oil pump

    Type: gear pump

    Capacity: 50m³/h

                 Circle pump:                   15kW            2units

                 Oiling pump                          1.5kW      1unit

                 Hot oil System power:20kW 

    Note: if product construction, technique advancement, parameter and complement have some change, it is standard of products or contract.

    Hits:  UpdateTime:2012-07-12 14:51:41  【Printing】  【Close
    Online 
    nancy MSNnancy
    kate
    charlotte MSNcharlotte
    shirley MSNshirley
    kate
    charlotte
    shirley
    Email to us